BuildTrack
PricingSupport
011-2057-8260Log in
Get started fastRun your first project this week.
See the full platformFrom leads to MYR billing in one place.
Built for construction teamsMain-cons, specialists, owners and designers.
Plans that scale with youFrom solo trades to multi-site builders.

Sales

  • Lead management
  • Quotation software
  • Contractor CRM

Delivery

  • Robin
  • Job & site tracking
  • Crew scheduling & dispatch
  • Daily site reports
  • Construction project management

Finance

  • Construction invoicing
  • Progress claims
  • Job costing & profitability
  • Variation orders & SST

People

  • Contractor payroll & commissions
  • Time & attendance tracking
  • Labour cost tracking

Firm Type

  • General Contractor
  • Specialty Contractor
  • Owner
  • Designer

Log and close defects

Last updated: 29 August 2026

Defects live on the job's Defects tab. Raise one from site with a photo and a location, assign who fixes it, then walk it through to Verified — so at handover you have a list with proof attached instead of an argument.

Log a defect from site

Open the job, go to Defects and press New defect. Only the title is required, but the more you fill in from site, the less chasing happens later.

  1. 1

    Title

    What is wrong, in plain words — “Cracked tile”, “Paint runs to soffit”.

  2. 2

    Location

    The unit or area, so whoever fixes the defect can find it without ringing you.

  3. 3

    Due date

    When the defect needs to be fixed by. Anything past its date is flagged as overdue.

  4. 4

    Assigned to

    One team member or one subcontractor — not both.

  5. 5

    Photos and notes

    Take the photo while you are standing in front of the defect. The photo is the evidence that closes the item.

Move a defect through to Verified

A defect runs through five states:

  1. 1

    Open

    Raised, nobody has started. New defects begin here.

  2. 2

    In progress

    Someone is working on the defect. Set this from the Status dropdown.

  3. 3

    Fixed

    The defect work is done and waiting to be checked. Press Mark fixed on an Open defect.

  4. 4

    Verified

    The defect is checked and signed off. Press Verify on a Fixed defect.

  5. 5

    Rejected

    Not accepted as a defect. Set this from the Status dropdown.

Each defect keeps its own history — when it was raised, when photos were added, when it was marked fixed and when it was verified. That trail is what you show when someone asks whether a defect was really done.

Stay on top of the defect list

The strip at the top of the Defects tab shows your total defects, how many are still Open and how many are past their due date, and how many are Fixed but waiting on sign-off — usually the list that holds up a handover. Filter the defect list by status, assignee or due date, and sort by due date when you are planning the week.

Export the defect list for the client

Press Export to PDF on the Defects tab for a defects list you can email or print. Leave the dates unset to export every defect on the job, or set a due-date range for a specific meeting. For day-to-day site updates and photos, see Track jobs from site.

Common questions

BuildTrack

Construction management software for Malaysian teams — programme through to MYR billing.

Product

  • Products
  • Pricing

Firm types

  • General Contractor
  • Specialty Contractor
  • Owner
  • Designer

Company

  • Careers

Get started

  • Log in
  • Get demo

Support

  • Help Centre
  • Contact us
  • 011-2057-8260
  • hello@buildtrack.com.my

© 2026 BuildTrack. All rights reserved.

Terms of ServicePrivacy PolicyDPASitemap