Run a sales order
Last updated: 6 November 2026
Once a customer signs, Create project opens the job in Pre-start so you can tick off everything that must happen before site work starts. Order materials from the checklist, then press Start site work.
Create the project
Start from the quotation with Create project. The quotation must be approved and the customer must have accepted. Declined and cancelled quotations cannot be used.
Project name and contract value
These come from the quotation. Change the name if the signed scope needs a clearer title.
Template
Pick the checklist this project follows in Pre-start. It is copied in when you create, and you cannot switch template afterwards. Choose No template to begin with no steps.
Work the steps
Open the project and go to Programme › Pre-start. The page lists your stages and the steps inside each. A step has a status (To do, In progress, Done or Not needed), who it is assigned to, a due date and notes. Some steps also ask for an answer such as a permit file, a date or a link. Each stage shows how many of its steps are done and its due date, which is the latest due date of its steps. The Summary page also shows a Pre-start card while the checklist is open.
Skip what does not apply
Mark a step Not needed, for example a renovation permit on a studio unit.
Add a step
Type a name at the bottom of any stage and press Enter. It is added straight away as a text step; use Edit to change its field type.
Change this project's own list
Press Edit. Add, rename, delete or drag stages and steps, set due dates and who is responsible, then Save. A person set on a stage is the default for its steps; a step with its own person uses that one instead. These changes affect this project only, not your template.
Order materials from here
The steps that cover suppliers hold the Order materials button, the linked requests for quotation and purchase orders (with New request and New purchase order buttons), and the subcontractors lined up for the project. See Request quotes from suppliers.
Start site work
Start site work turns on when every step is Done or Not needed. If it is greyed out, hover or tap it to see which steps are still open. After you start, the checklist becomes read-only and its answers are kept. Requests and draft purchase orders raised in Pre-start move with the project.
Build your templates (administrators)
Go to Settings › Pipeline › Pre-start workflows. Add stages (up to 20) and the steps in each, choose what each step records (a checklist, text, date, appointment, link, dropdown, people, a supplier, a subcontractor, deposit received, or a file or photo), and press Publish. You can also open Pre-start on a project and choose Save as template to reuse its stages and steps. One template is the default and is preselected when someone creates a project.




